Platform / Validation

Acceptance is earned through checks, not claimed by the executor.

ILAIOS treats validation as an independent control layer. A tool, worker, or intelligent capability can produce an outcome, but acceptance depends on explicit criteria and evidence.

Deterministic checks first

Where outcomes can be tested with schemas, rules, tests, signatures, policy checks, or technical probes, ILAIOS prefers deterministic validation over narrative confidence.

Independent verification

High-impact work should not be accepted solely because the component that performed it reports success. Validation remains separable from execution.

Evidence-backed decisions

Validation results, relevant context, and acceptance decisions can be retained as reviewable evidence for audit, troubleshooting, and recovery.

Bounded recovery

A failed check should lead to an explicit retry, repair, escalation, or stop condition rather than an uncontrolled loop.